Krzeszowice - Renovation of the access track at the Czekawice Limestone Mine
- jdebrouwer
- 11 sty 2017
- 1 minut(y) czytania
The scope of our works included the overhaul of the access track section along with the overhaul of the crossing at the rail level, and ballasting of the track on the Ordering Party's siding, using a set of track machines (self-leveling track tampers).